+1(316)4441378

+44-141-628-6690

Our Services

Develop a Work Breakdown Structure (WBS) and project schedule

Develop a Work Breakdown Structure (WBS) and project schedule in a Gantt format for the E-Mail Upgrade Project described in the scenario. The WBS and resultant schedule should contain the following high-level activities:

1.0 Evaluate User & System Requirements
2.0 Evaluate ODHS Network Suitability
3.0 Conduct E-mail System Selection
4.0 Upgrade ODHS Network & Hardware
5.0 Develop E-mail Training
6.0 Deploy E-mail System
Each of the six WBS elements should be decomposed into two or more activities; additionally, three of these six elements should be decomposed into a third level consisting of at least two more activities. Thus, there should be six high level WBS elements, twelve or more second level activities (two per the six elements), and six third level activities. Use the format described above to define the activities (action verb followed by subject, such as Deploy E-mail System).

The Gantt chart should be developed based on the WBS (all activities should be detailed on the Gantt chart). The Gantt chart should reflect the proper dependencies of each of the activities (for example, you cant have “Deploy E-mail System” before “Evaluate User Requirements”). For activity duration, provide a reasonable estimate of the time you expect each activity to take; while students are not expected to provide accurate durations, durations should be reasonably defensible and logical. For formatting ease, high level activities should be left justified while second and third level activities should be indented below their parent activities.

 

You can place an order similar to this with us. You are assured of an authentic custom paper delivered within the given deadline besides our 24/7 customer support all through.

 

Latest completed orders:

Completed Orders
# Title Academic Level Subject Area # of Pages Paper Urgency
[order_calculator]
Copyright © 2016 Quality Research Papers All Rights Reserved